www.crossway.tumblr.com
2009
December
18
November
October
September
10
August
2
July
13
June
2
May
14
April
4
March
18
February
24
January
34
2008
December
29
November
46
October
42
September
54
August
34
July
40
June
16
May
26
April
35
March
23
February
8
January
19
2007
December
4
November
4
October
19
September
20
August
7
July
June
May
April
March
February
January
Structural engineer’s mock-up of the timbrel arch...
Oct 30th
The site as of Sunday 28th October 14.00 - bungalow...
Oct 30th
Bungalow demolition
South Kent Plant & Demolition have done a superb job. The bungalow might as well have never...
Oct 30th
From rustic to rubble in 20 minutes
Oct 30th
The bungalow timber frame disposal
Oct 30th
The aftermath. A very large and very hot fire, which we...
Oct 30th
Watch
chimney stack demolition
Oct 30th
Watch
Bungalow demolition 10 minutes in. Bye bye front door !
Oct 30th
Watch
Demolition of the bungalow begins
Oct 30th
Vault tiles The first batch of tiles being made with...
Oct 23rd
Bungalow demolition after the asbestos strip out
Oct 23rd
Bye Bye Asbestos
Following another good day’s work by the demolition contractor the bungalow is now free of...
Oct 23rd
Ecological survey complete
Following a records survey, site scoping survey and subsequent bat survey (revealing that we...
Oct 17th
Bungalow demolition
The bulldozer will be present on Friday 26th October. By then all the asbestos will have been...
Oct 17th
Demolition begins
Demolition works start today with the stripping out of the internal asbestos panelling.
Oct 17th
WE HAVE POWER !
EDF have finally disconnected the bungalow and moved the meter to provide us with electricity in the...
Oct 17th
HawkesArchitecture.co.uk
Oct 12th
Electricity in the caravan
EDF have finally decided when they’ll come and connect the electricity to the caravan....
Oct 4th
Ecoplay greywater recycling system
Oct 1st