view from the garden.  just waiting for the last few windows...
Oct 25th
view as if you were lying in bed in the guest bedroom.  The...
Oct 25th
the north west wing is being built in parallel with the...
Oct 25th
my office, ready for plasterboarding.  I can’t wait to...
Oct 25th
the north east wing is now being built, which really helps...
Oct 25th
the lounge before the plasterboarding.  We had a few sheets...
Oct 25th
the car port steelwork has now been fitted, as have the zinc...
Oct 25th
i love the way sunlight hits the vault.  the glazing is...
Oct 25th
the end bedrooms have a short wall that abuts the arch....
Oct 25th
the vault looks so good i just can’t stop taking...
Oct 25th
another bedroom 4 view.  Notice the low window handle - well...
Oct 25th
view from within bedroom 4 with the plasterboarding in...
Oct 25th
plasterboarding gets underway in the master bedroom
Oct 23rd
Michael Ramage used the Cambridge University 3d printer (yes...
Oct 17th
view from the guest bedroom.  This is the view guests will...
Oct 15th
view looking down on the south block from the top deck
Oct 15th
view from the entrance hall with the top deck removed in...
Oct 15th
the original structural model undergoing some strength test...
Oct 15th
Master bedroom with the energain shining bright.  The open...
Oct 13th
I hope they took a photo !  If you know who was in this...
Oct 11th
The master bedroom has just been fitted with Dupont...
Oct 11th
“Oh what a beautiful ceiling”
Oct 4th
view from the playdeck looking toward the south wall.
Oct 4th
from the south east - scaffold modifications have been made...
Oct 4th
view from the pladeck.  The central section of floor will be...
Oct 4th
view looking up into the vault from the guest bedroom
Oct 4th
view from the guest bedroom into the hallway & stairwell
Oct 4th
Joe pumping in the recycled newspaper insulation into the...
Oct 4th
view of the vault from within the playdeck.  The space feels...
Oct 4th
view up the entrance path.  The scaffold has been modified...
Oct 4th
Detail view of the vault beside a window.  The vault is...
Oct 4th
view up to the roof from the guest bedroom
Oct 4th
up the top just before the last tiles were put in
Oct 3rd
The Warmcell (recycled newspaper insulation) installers are...
Oct 3rd
A different view from within the garden, among some of the ...
Oct 3rd
an update view from the north side, which is ready for the...
Oct 3rd
Mark pondering the next step.  The stiffening ribs are being...
Oct 3rd
The culmination of lots of hard work as Tony puts the last...
Oct 3rd
Tony & Royd are tasked with completing the internal...
Oct 3rd
the last few tiles waiting to be put in.  Cameras loom to...
Oct 3rd
Up at the top the arch is a day away from being closed in...
Oct 3rd
View toward the dining room with the tiles completed at this...
Oct 3rd