south view - it’s nearly finished now !  I so...
Dec 23rd
north view - the timber cladding is close to completion....
Dec 23rd
In the kitchen the first area of recycled glass flooring...
Dec 23rd
The last area of brickwork is nearing completion.  The house...
Dec 23rd
view from the pedestrian gate.  The rubber roofing is...
Dec 23rd
the car port entrance door, complete with lock & handle....
Dec 23rd
view from the drive entrance
Dec 23rd
Mike, the neighbouring farmer, saving the day as has so...
Dec 23rd
me & Anthony Morgan (Newform Energy) unloading the PV-T...
Dec 23rd
A very frosty December 12th morning with beautiful clouds...
Dec 12th
from the public footpath.  The golden morning sunlight was...
Dec 12th
a lovely frosty Staplehurst sunrise.
Dec 12th
view from the south along Five Ash Lane.  There was some...
Dec 12th
Jason posing inconspicuously while Paul & Winks carry...
Dec 12th
view looking into the car port
Dec 12th
north east view.  The brickwork is complete and the vertical...
Dec 12th
mark & dave cutting out Heras fencing mesh to use on the...
Dec 12th
the vault is being dressed with an erosion stabilising...
Dec 12th
west view showing the flare to the south vault overhang
Dec 12th
it’s not an exciting photo but this is the...
Dec 12th
view into the car port - spot the entrance door?
Dec 6th
view into the house from the entrance hall.  We’re now...
Dec 6th
the vertical cladding is really helping the building feel...
Dec 6th
Disco Dave fitting the graphite polystyrene vault...
Dec 6th
master bedroom plastered & ready for painting
Dec 6th
view from the entrance path to the front door.  The...
Dec 6th

First air leakage test result; 1.2

On Friday we had our first air leakage test.  The result was 1.2 m3/(h.m2) @ 50 pascals, which was...
Dec 1st
the lounge.  I put the 1st coat of paint on the lounge on...
Dec 1st
south view - the finishes are progressing well.  Brickwork...
Dec 1st